HP Checklist and Photo Requirements for Installers

HP Checklist for Contractor Installers

This checklist presents what CEC expects for all HP installs for BPA/CEC incentive.

Outdoor Unit

  • Prepared ground surface that is flat and level
  • Install pad or pad blocks
  • Use risers or riser blocks
  • Anchor unit to risers
  • Avoid installing outdoor unit on deck or near pathway

Line Set

  • Insulate entire line set length (Best Practice is to insulate the fittings also)
  • Protect outdoor line set with line hide or cover with a UV protective material
  • Seal penetrations through the shell with insulative sealant

Condensate Line

  • Must slope downhill
  • Must exit the shell
  • Output should avoid walkways and decks

Indoor Unit(s)

  • Level
  • Explain controller
  • Explain filter cleaning/maintenance

Required Photographs

  • Photograph of the front outdoor unit, showing pad, risers, and level unit
  • Photograph of outdoor unit manufacturer’s label
  • Photograph of each indoor unit installed showing placement in room(s) (if applicable)
  • Photograph of each indoor unit’s manufacturer’s label
  • Photograph of each condensate line termination
  • Photograph of insulated line set
  • Photograph of exterior line set house penetrations
  • Photograph of backup heating lockout setting at 35 degrees